Position:
Home
/
Company News

Congratulations on the successful completion of Limu Technology Phase II Cold Rolling Mill Li memorial archway

  • Date: 2020-06-17
  • Hits: 6703

Summary DescriptionAt 11:38 a.m. on June 15, 2020, the installation of Phase II cold rolling mill memorial archway of Limu Technology was successfully completed.

Congratulations on the successful completion of Limu Technology Phase II Cold Rolling Mill Li memorial archway

Summary DescriptionAt 11:38 a.m. on June 15, 2020, the installation of Phase II cold rolling mill memorial archway of Limu Technology was successfully completed.

  • Date: 2020-06-17
  • Hits:6703
Detailed information

At 11:38 a.m. on June 15, 2020, the installation of Phase II cold rolling mill memorial archway of Limu Technology was successfully completed.

The cold rolling equipment was purchased from North Heavy Industry Group Co., Ltd. The memorial archway of the cold rolling mill is an integral cast steel type with a height of 6800mm, a width of 3580mm and a thickness of 940mm. Its company is one of the top 500 enterprises in China. As the core basic component of the rolling mill, the rolling mill memorial archway is the frame of the whole rolling mill and bears the weight of the whole cold rolling mill equipment. Its stiffness and strength are the key to ensure product accuracy and equipment reliability.

The installation of the cold rolling mill memorial archway marks the beginning of the installation of cold rolling line equipment in the second phase of the construction project of the Moment Science and Technology, and takes a solid step towards the realization of the project of the production line of 180000 tons of high precision aluminum plate, strip and foil per year.

  

Follow us on social media

Address: No. 9, Yulan West Road, Suixi Economic Development Zone, Huaibei City, Anhui Province

What products and services do we provide for you?

Copyright © 2022 Anhui Limu New Material Technology Co., Ltd.